Skip to content
CIG
  • Home
  • Products
    • Heat Exchangers (Coils)
      • 5mm Coil
      • All Aluminum Coil
      • Condenser Coil
      • Water Coil
      • Evaporator Coil
      • Tube-in-Tube Heat Exchanger
      • Fin & Tube Spec
    • COATING
      • D-Coat
      • HERESITE
    • HVAC/R Units
      • Heavy Duty Air Purifier
      • Air Purifier AP 450 CMH
      • Air Handling Unit (AHU)
      • Air Cooled Condenser (ACC)
      • Condensing Unit (CDU)
      • Unit Cooler
    • Building Envelope
      • KingZip
      • K-Dek
      • Foilback
      • RW
      • Benchmark
      • Architectural Wall Panels
      • Cold Store
    • ARII Smart Solutions
      • ARII Smart Solutions
    • Downloads
  • Services
    • Services Submenu
      BluSolutions
      M&E Design & Solutions
      Coil Replacement
      Cold Room / Cold Store Design & Installation
      Smart Solution Design & Installation
      Product Development
  • About CIG
    • About CIG
    • PDPA (Personal Data Protection Act, B.E. 2019)
    • Careers
    • Contact
    • CIGCARE
  • News
  • Investor Relations
    • EN
    • ไทย

Adobe Dri-Design

Project

52418
52419
52420
52421
52422
Previous
Next

Vertical and horizontal Dri-Design Flat cassettes bring depth to the Adobe building in Utah

The Project

“Distinctive, awesome and bold”. That was the design goal for the new corporate campus of Adobe in Lehi, Utah. The 207,264m2 campus is located directly off a major highway, putting the headquarters on display with the Traverse Mountains serving as a stunning backdrop.

Dri-Design cassettes made with zinc brought a bold statement and identity to the structure while invoking a natural connection with the surroundings.

Architect: WRNS Studio
Location: Utah, USA
Product: Dri-Design Shadow and Flat
Material: Zinc

Dri-Design cassettes made with zinc brought a bold statement

The Dri-Design cassettes were installed both vertically and horizontally to bring depth to the building. Horizontal cassettes were used on a larger scale with custom shadow-fin profiles to exploit the abundance of sunlight and changing skies of Utah. The zinc cassettes also bring contrast to the glass curtainwalls used throughout the design.

The Adobe headquarters is a LEED Gold structure.

The Adobe headquarters is a LEED Gold structure. Adobe now has a 60,960m2 office building; 24,384m2 amenities building, including a basketball court, café and fitness centre; an atrium that  links the two buildings; and a campus green. Expansive views, open stairs, a flood of daylighting and natural elements are all part of the intention to bring Adobe employees a sustainable work environment that allows for a proper worklife balance. This building inspires creativity, attracts and retains employees, and provides a higher level of energetic work and play.

C.I. Group Public Company Limited

Head Office:
1/1 Moo 7 Bangkoowad Road, Bangkoowad,
Amphoe Muang Pathumthani 12000 Thailand

  • Telephone: (66) 092-463-2366, (66) 0-2976-5290
  • Fax : (66) 0-2976-5023
  • Email : contact@cigblusolutions.com
  • Line: @CIGCare
Facebook-f Twitter Youtube Line
  • Products
    • Heat Exchangers (Coils)
    • HVAC/R Units
    • Building Envelope
    • ARII Smart Solutions
  • Services & Solutions
  • Project References
  • About CIG
  • PDPA (Personal Data Protection Act, B.E. 2019)
  • News
  • Careers
  • Contact
Copyright © 2023 CIG

Start typing and press enter to search

Scroll to Top

Start typing and press enter to search

Close Bitnami banner
Bitnami